Skip to content
For the complete documentation index, see llms.txt. This page is also available as Markdown.

Assure

Assure answers "What needs to be resolved before release?". It compares gate conditions, approvals, freezes and evidence, holds the approval requests waiting for a person, and lets release managers define a release, collect sign-offs and record a Go or No-go decision.

Open it from Workspaces → Change Assurance → Assure in the sidebar. The tab shows how many approval requests are waiting.

Requires the Change Assurance licence. You need a role that can view the Change Assurance dashboard; recording approval decisions needs a role that can manage approvals. Environment progression and Gate skips need a role that can view assets.

Do These Next

The page opens with the most important actions across active releases, for example a required release step that is not met yet. Each has a button such as Review release decision. Show all n actions lists every action.

Views

View
Use it to

Decision work

Decide on changes the gate held for a person.

Release planning

Define releases, collect sign-offs and record the release decision. Opens by default.

Changed after release

Place changes made to a shipped release's assets.

Remedial actions

Remediate failing configurations and policy checks.

Environment progression

Review promotion chains between environment stages.

Gate skips

Review deployments that skipped a required stage.

Decision Work

Decision work with tiles and the approval decisions list
Tile
Description

Awaiting decision

Current approval requests.

Approved

Recorded approvals.

Rejected

Recorded rejections.

AI Assisted

Approval requests for AI-assisted changes.

Active releases

Draft, planned and built releases.

Longest waiting

The oldest pending request.

Approval decisions lists each change a gate held for a person. Pending means nobody eligible has approved, rejected or overridden it yet. The list starts on Pending for All reviewers; change either filter to see other states or your own requests. Current work does not depend on the Period.

Column
Description

Change

The change the gate held.

State

For example Pending.

Reviewer

The assigned reviewer, or Eligible pool when anyone eligible can decide.

Why it is waiting

For example "Gate blocked: needs an override with justification".

Waiting

How long the request has waited.

Actions

Review approval and Open change dossier.

Review and Decide a Request

Review change approval drawer
  1. Click Review approval on the request. Review change approval shows What you are approving, why it is waiting, and each finding with what to do about it. Open change dossier opens the change.

  2. Optionally assign it under Assign a reviewer or a team: type 3 or more characters of a person's name or email, or pick a team (any member can then pick it up), and click Save assignment.

  3. Under Record your decision, choose:

    • Approve: accept the change as it is.

    • Reject: it should not have happened; the owner follows up or rolls it back.

    • Override: accept a change the gate blocked, with a written justification.

  4. Write the justification. It is required and kept with the signed evidence.

  5. Click Record approval decision.

Release Planning

Define the cross-platform assets that ship together. Planning states are reported by people and do not assert that a release is ready to deploy.

Release planning with tiles and the releases list
Button
Description

Release settings

Central release sign-off templates: versioned, reusable review steps.

Pending sign-off work

The sign-off steps waiting for reviewers.

From Jira release

Start a release from a collected Jira release version.

New release

Define a release from scratch.

Tile
Description

Defined releases

Saved release definitions in Draft, Planned and Built.

Drafts to plan

Releases still in Draft.

Planned releases

Releases marked Planned. Planned is intent, not a deployment authorization.

Releases lists every saved definition, independent of the Period. Filter: LIFECYCLE STATE. Columns: Release, State, Owner, Planned, Current asset signals (assets at risk and unassessed) and Actions (Inspect opens the release dossier).

Suggested release scopes proposes releases from what was collected: Jira releases (versions with their issues, Review Jira release) and groups of assets that share a ticket (Evidence & assets, Review suggestion). Review the scope before saving a draft.

Define a Release

  1. Click New release (or review a suggestion).

  2. Under Release details, fill in the fields below.

  3. Under Selected assets, click Choose assets and pick the assets that ship together. Pin version selects the assessed version or source reference of an asset.

  4. Under Release sign-off requirements, choose a saved template and click Apply template to this draft, or click Configure release-specific steps to add steps, reviewers and due dates for this release only.

  5. Optionally add Related recorded changes and Related tickets under Related work & notes. A release with assets only is valid.

  6. Click Save release. Back to releases leaves without saving.

Field
Description

Release name

The release's name.

Lifecycle state

Draft, Planned, Built · reported, Released · reported or Archived. States and dates are reported by the person saving, not verified pipeline events.

Owner (name or team)

Who owns the release.

Planned date and time

When it should ship.

Built at (reported, optional) / Released at (reported, optional)

When it was built and released.

Saving a release records a new revision, and sign-offs are needed again for that revision. Only a reviewer who can manage approvals and can see the release may sign; an assigned step can be signed only by that person.

Release Dossier

Inspect opens the release dossier; Open full dossier opens it as a page. The header shows the state, number of assets and attached changes and the definition revision, with Manage and Edit definition.

Tab
What it shows

Readiness & decision

The recommendation (for example "Not ready: 2 blocking conditions") and the checks: every change has a ticket, is attributed, clears its gate and its approvals, and has signed evidence. Do these next lists the conditions to resolve before Go. Then the sign-off steps, the release decision and its history, and the release checks (assets with risk, passing and unassessed assets, changes to review, owner, planned date and freeze overlaps).

Assets

The assets in the release.

Changes

The changes attached to the release.

Outcomes

Incidents its changes caused (confirmed in an incident review, each a failed change for the release) and incidents on its assets after it shipped.

Build & lifecycle history

The reported lifecycle and build history.

Evidence & tickets

The evidence and tickets behind the release.

Management

The release plan (owner, lifecycle state, planned, built and released dates, version) with Edit scope, owner & state. Built and Released are reported planning states: editing a definition does not deploy, approve or certify a release.

Sign Off and Record the Release Decision

  1. In Readiness & decision, click Assign reviewers to give each manual step one reviewer. Unassigned steps stay open to every eligible reviewer.

  2. Each reviewer signs their own steps. Recorded-evidence checks are satisfied by the evidence itself, not by a person's approval.

  3. Record the decision: No-go, Go with exception or Go. A Reason is required for an exception: include the accepted risk, owner and follow-up.

Changed After Release

Changes to the assets of a shipped release, recorded after it shipped and held by no release yet. Each is listed once, against the most recent release that holds its asset. Decide where it belongs: carry it into the next release that holds the asset, or record it on the shipped release as a hotfix. An unplanned or emergency change goes through its own approval and ticket.

Filters: SHIPPED IN and SUGGESTED HOME. Columns: Change, Asset, Shipped in, Suggested home and Actions.

Remedial Actions

Issues & actions lists the current failing configurations and policy checks, grouped by issue type and platform. Choose an issue to review its actions and remediate an affected asset. Run history lists the remediation runs.

Filters: ISSUE, PLATFORM, CONFIGURATION and SEVERITY. Columns: Issue type, Platform, Configuration, Affected assets, Severity, Last assessed and Actions.

A recorded run does not establish that an issue is fixed: assess the asset again to verify the result. Drift investigations stay in Detect → Governance drift.

Environment Progression

Each application from its earliest environment stage to its latest, with what every stage depends on. Promotion chains shows the chains as Chains, Links, Graph or Table; Review proposals lists proposed promotion links to confirm. Filters: LINKS INCLUDED, PLATFORM and ASSET TYPE. Choose a chain, then a copy, to explore it end to end. Confirm all awaiting confirms every proposed link in the shown chains.

Gate Skips

Deployments that reached a stage without passing a required stage before it. Gate policies check required stages when a change is evaluated; optional stages can be skipped. Stage configuration opens the stages, and What do these statuses mean? explains each status.

Filters: SOURCE OR POLICY and STATUS. Columns: Severity, Source / policy, Reached, Skipped gate in, Asset, What happened, Detected, Status and Actions. No findings does not prove every change passed its gates.

Next Steps

  • Detect: find the changes behind a request.

  • Prove: export the evidence behind decisions.

  • Policy: set who must approve and by when.

Last updated

Was this helpful?