Skip to content
For the complete documentation index, see llms.txt. This page is also available as Markdown.

Overview

Overview answers "Every change, with its context": how many changes you detected, what waits for a decision, whether you can show the auditor and whether changes caused failures. Change approvers, release managers and auditors start here; every figure opens the records behind it.

Open it from Workspaces → Change Assurance → Overview in the sidebar.

Requires the Change Assurance licence. You need a role that can view the Change Assurance dashboard.

Stage Cards

Four cards, one per stage, for the selected Period. Select a card's link to open that stage.

Card
Question
What it shows

1 · Detect

Did we see every change?

Recorded changes and how many sources they came from, and how many changes are to review (for example without a ticket).

2 · Assure

Was each change checked and approved?

Approval requests waiting for a decision and the active releases.

3 · Prove

Can we show the auditor?

The share of changes with a stored signature, and whether evidence integrity was verified in this session.

4 · Improve

Did changes cause failures?

The change failure rate (or Not measured when no production deployment records are connected) and incidents without a confirmed cause.

Needs a decision and Changes outside the process panels

Needs a Decision

The top open decisions, overrides about to expire and release work.

  • Open decision work opens Assure → Decision work. Each listed change has Review.

  • Plan releases opens Assure → Release planning with the active releases (Draft, Planned and Built).

Changes Outside the Process

Changes that bypassed part of the recorded path: no linked ticket, no named actor or no gate result.

Row
What it counts

No linked ticket

Changes that cite no ticket.

No named actor

Changes with no named person or account.

No assessment

Changes with no gate result.

Each count has Review. The latest such changes are listed below, each with Review. Open Detect opens Detect; Inspect drift opens Governance drift.

Audit Readiness

Exceptions, evidence integrity and evidence coverage for the period. Open Prove opens Prove.

Row
What it shows

n exceptions open before the audit

Exceptions in force, requested, expiring and lapsed. Each needs a reason, a decision and an expiry.

Evidence integrity

Whether the signed evidence was verified in this session. Opening the page verifies nothing: Verify on Prove runs the read-only check.

Evidence record on n% changes

Changes in the period that have an evidence record.

No signed verdict

Changes without a signed gate verdict.

No recorded control coverage

Changes whose evidence maps no control, so no control can be shown as tested.

Changes That Caused Incidents

Incidents in the period, confirmed causes first. A change is named as a cause only when a person confirms it in an incident review. Open Improve opens Improve.

Figure
Description

Change failure rate

Needs production deployment records; otherwise Not measured.

Without a confirmed cause

Incidents no one has tied to a change yet.

Overrides that later failed

Warned or blocked changes that were approved and later confirmed as an incident cause.

Deployed, then degraded

Deployments after which Service Health read down or degraded. An association, not a cause.

Change Sources

The current inventory, independent of the period: Recorded assets, assets Read by this IZ Suite and assets with No reproducible source. Each connected source shows its state, asset count and last collection, with Inspect source. Connect buttons list the sources not connected yet. View coverage opens collection coverage in Connections.

Remediation Follow-Up

Current remediation work: Open tasks, Overdue and Blocking severity, with the next tasks and their owners and due dates. Review work opens the work list; Review remediation policy opens the remediation settings.

Charts

  • Recorded gate decisions: changes Allowed by gate, with a Warning recorded, Blocked by gate and with No assessment.

  • Where the evidence trail is incomplete: changes with no assessment, no linked ticket, no named actor, no signed verdict or no recorded control coverage. One change can appear in several bars.

Select a bar for the records behind it, or Show data table for the numbers.

Overview reports what the records show. It does not infer a safety or compliance score.

Next Steps

  • Detect: investigate the changes behind the gaps.

  • Assure: act on approvals waiting and plan releases.

  • Change Assurance: how the stages fit together.

Last updated

Was this helpful?