Risk Matrix

Risk matrix connects your risk ratings to application checks, evidence, consequences and treatment decisions. Each risk is a rule with its configured likelihood and impact, listed once however many controls it is mapped to.

Open it from Workspaces → Compliance → Risk matrix in the sidebar.

Summary Tiles

Tile
Description

Risks

Distinct risks, and the number of control mappings behind them.

Need attention

Risks where at least one current application check fails.

Not evaluated

Risks with no current validation in your application scope.

Recorded checks pass

Risks whose mapped checks pass in the assessed applications.

Select a tile to filter the register. Application evidence is limited to the applications and findings you can access. No current validation means not evaluated; it does not mean compliant.

Filters

Filter
Description

Status

All assessment states, Failing assessments, Not evaluated or Recorded checks pass.

Standard

A standard, or All standards.

Platform

The applications' platform, or Not evaluated for risks no application in scope has assessed (application risks only).

Asset type

One asset type of the chosen platform (application risks only).

Applicability (under Filters)

Applicable controls, All configured controls or Excluded / disabled controls.

Likelihood × Impact

Likelihood and impact grid
Likelihood × impact

The grid places each risk by its likelihood (rows) and impact (columns), using the levels in Scoring Settings. The score is likelihood × impact, and the colour shows the band the score falls in. Each cell shows the band and score, the number of mapped risks, and how many have failing assessments.

  • Choose Inherent risk to see ratings before any treatment. Decisions do not move them.

  • Choose Residual risk to see where risks sit after the residual ratings recorded in their decisions. A risk moves once every applicable control has a residual rating (the highest is used); otherwise it stays in its inherent cell.

Select a cell to list its risks in the register below. An empty cell means no mapped risks in that category, not that the risk cannot occur.

Customize Risk Bands

The bands are a display policy for all standards. Starter bands are Low (0 to below 5), Moderate (5 to below 10), High (10 to below 15), Very high (15 to below 20) and Critical (20 and above). Risks with missing values are Unrated.

  1. Select Customize risk bands.

  2. Change each band's Label, From score and Color, or use Add band and Remove. You can have up to six bands.

  3. Enter the Reason for changing the policy.

  4. Select Save customer policy.

Customer risk policy dialog
Customer risk policy

Risk Register

The register lists the risks that match the filters and the selected cell.

Column
Description

Risk / controls

The rule, the standards and number of mapped controls, and the potential consequence. Expand a row to see each control mapping.

Likelihood / impact

The ratings and the resulting band and score.

Current evidence

For example Failing assessments, with failing and assessed application counts.

Treatment

The decision, for example Treat or Tolerate: Residual risk, how many controls are decided, and alerts such as Review overdue.

Review

Open risk.

Export this page downloads the rows on the current page.

Open a Risk

Open risk shows the failing and assessed applications, the standard and control, likelihood, impact, configured score, risk type, treatment, review status and latest included assessment. It also shows:

  • Every control the risk is mapped to, with its applicability and decision. One treatment plan covers all of them.

  • Shared treatment plans for this risk, and Plan treatment for all occurrences to create one. See Treatment Plans.

  • Owner, treatment and review: the recorded decision, residual rating, review and expiry dates, and Decision history.

  • Consequence and treatment: the potential consequence, remediation and review notes.

  • Review control & treatment and Review likelihood & impact.

  • Current application evidence: validations from each application's latest assessment.

When a treatment plan can cover a risk, the decision is made through the plan. For other risks, record the decision on the risk itself: the accountable person or team, decision status, treatment approach, next review, treatment plan and target date, residual likelihood and impact, acceptance expiry, verification evidence and the decision rationale.