Standards & Frameworks
Standards & frameworks is the standards library. Enable the standards your customers need, review their controls and mappings, then retain an assessment snapshot for review. Disabled standards keep their configuration and history.
Open it from Workspaces → Compliance → Standards & frameworks in the sidebar.

Standards Library
Status
All standards, Enabled, Custom or Disabled.
Impact calculation
Maximum of all measures or Manual selection.
Search standards
Find a standard by name.
Save filters stores the filters under a name.
Each standard is a card:
Supplied / Custom
Whether the standard comes with IZ Suite or was created by your organization.
Active / disabled
Whether the standard is enabled.
Edition and scope
The edition and what the standard covers.
Score
The Last calculated native-rule score. It needs application validation results; change-control assessments do not add to it.
Coverage
Standard controls and how many are linked to native rules; native rules mapped and how many have validation records; change controls mapped, enabled and with assessment records.
The change-control count shows evidence coverage, not a pass rate.
Card actions:
Review control policies →
Opens the standard's control hierarchy.
Disable standard / Enable standard
Turns the standard off or on for this workspace. A disabled standard keeps its controls, mappings, last scores and retained evidence. An enabled standard's score refreshes on the next compliance validation run.
Manage standard
Opens the standard's details.
Recalculate Scores
Recalculate scores queues a score recalculation of every enabled standard. Otherwise scores refresh when new assessment results arrive, and on the 1st and 15th of each month.
Create a Standard
Select Create standard.
Complete the fields below.
Select Save changes.
Standard name
Required.
Description
Required.
Score calculation
Multiply all measures. Required.
Impact calculation
Maximum of all measures or Manual selection. Required.
Impact measures
Shown for Maximum of all measures. The measures that describe the impact of a control failure. Add at least one. Changing them clears the impact chosen per measure on each rule of the standard.
Status
Enabled or disabled. Required.
Manage a Standard
Manage standard shows the scoring method, impact calculation and creation date, with links to Inspect control policies →, Review rule impact measures → and Find retained assessments →. From here you can:
Edit standard: change the fields above.
Review control evidence: ask for an AI review of the standard's control evidence.
Create assessment snapshot: retain the current assessment. The snapshot appears in Assessment History once it is recorded.
Disable standard.
Control Hierarchy
Review control policies → opens a standard's page.

Calculated score
The score and its scoring method.
Controls
Controls in the standard and how many apply to this organization.
Controls with mapped rules
Controls with at least one mapped rule. Others need manual assessment or have no automated check.
Applications evaluated
Applications with results, and the number of recorded rule results.
Control hierarchy lists the criteria and their controls, each with its rules, change-control mappings and score, or Not evaluated. Use the search box, Expand all and Collapse all to navigate. Export controls downloads the hierarchy and Retain snapshot creates an assessment snapshot.
The page also has Recalculate scores, Create control, Rule impact (opens Mapped Rules) and Printable report. When the standard is also a change-control framework, Framework requirements & signed evidence shows the requirements evaluated from change decisions, asset assessments and the signed ledger. These do not add to the application score.
Next Steps
Mapped Rules: set the impact and likelihood of each rule.
Assessment History: open a retained snapshot.
Compliance: see all Compliance screens.
Last updated
Was this helpful?

